Next month (MAY), we are planning to cycle to Temburong via Limbang. The target date is on Sunday, 10th May 2009. The timetable of the event:
| 6:00am to 7:00am | round-up at Kuala Lurah Immigration Check point |
| 7:15am | expedition starts |
| 11:00am to 1:00pm | estimated time of arrival at Limbang and break for lunch |
| 1:00pm | Journey continues to Temburong |
| 2:30 to 3:30pm | arrived at Bangar, Temburong |
| 4:00pm | Journey back to BSB by boat |
There will be no transportation provided to Kuala Lurah nor an escort car will be provided during the journey. Bring along your spare tube, hand pump, water bottles, energy foods and etc. Lunch at Limbang will be at your own costs.
You can used Road Bike or MTB. I would be using MTB considering the road in Limbang and the boat trip to BSB. I don't want to get my bike scratch or 'injured' during the xpdc or while on the boat.
Jadinya siapa siapa yang berminat kan 'join' the group ride, just wait for us at the Kuala Lurah Immigration Check point. If there is any change in the date, I'll update it later
0 comments:
Post a Comment